Here in the top of the dome on Friday, where a lot of irregularities had to be made even:
From Strawbale Dome Minke |
The second layer of plaster covers the straw:
From Strawbale Dome Minke |
The vaults are also getting a more even finish - good work:
From Strawbale Dome Minke |
Zuzana helping out:
From Strawbale Dome Minke |
The surface is then made rough for better adherence of the next layer:
From Strawbale Dome Minke |
Piet making a nice curvature:
From Strawbale Dome Minke |
Spraying the top of the vault is not so easy:
From Strawbale Dome Minke |
We now have closed the windows with some PE membrane and heat the interior of the dome. At the same time the ventilators help draw the moisture out from the walls and once per 30 minutes the skylight ventilator pulls out the air from the inside. Hopefully this will make the plaster dry fairly quickly.
And in the evening some participants of the first workshop came back from their trip to the High Tatras - they experienced over 1m of snow. The weather has really been very unusual for this time of the year!
Son obras bonitas Full Very good
OdpovedaťOdstrániťI have read your post you have posted such a great information in your blog thank you for sharing please keep updating with great information.
OdpovedaťOdstrániťhttp://omegainteriors.co.nz/