Today is the big day - Minke arrives in the evening, and the makeshift roof has to be up. The two parts have to be connected and reinforced.
Putting up and stabilizing the legs with planks to get them in place:
A scaffolding had to be erected to connect the legs in about 7m height:
Driving big nails into the ground to keep the construction well grounded:
Putting up the 150kg heavy cover is complicated but works out in the end with the help of the crane and skilled "climbers"
The final result - the roof cover was made by
Classic Autoplachty, and will serve as a an outdoor workshop area for
ArTUR after use on the building site:
Minke arrived at 19h - just in time to see the finished result:
An evening meal with all the helpers - without them we would not have finished in time. Thank you!
A thunderstorm is in the coming, hopefully the roof will still be on in the morning!